PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling foundation walls at Monumental Stairs Facing East (800x600).jpg Pouring concrete at footings at Elev. 7-Stair -4,5 Facing North (800x600).jpg Poured concrete at footings at Elev. 7-Stair -4,5 Facing East (800x600).jpg Poured concrete at footings at Elev. 7-Stair -4,5 Facing South (800x600).jpg Footings at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg
Next page Backfilling foundation walls at Monumental Stairs Facing East (800x600)
Backfilling foundation walls at Monumental Stairs Facing East (800x600)